<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=490038435288789&amp;ev=PageView&amp;noscript=1">

Railway works in the Bolzano area

Railway works in the Bolzano area

Bolzano area regeneration programme, supported by the Autonomous Province of Bolzano, the Municipality of Bolzano and FS Group, provides for a spatial and functional redevelopment of the railway hub, by modifying the existing infrastructure and railway line, with the construction of a new railway station connected to underground park and ride terminals (bus terminal and car park).

The plans for the railway works currently being developed provide for:

  • Disposal of the existing railway areas and the assets used for railway operations within the railway area.
  • All the station’s operational functions, especially those concerning rail traffic and infrastructure maintenance activities, based on the project model.
  • A rolling stock maintenance facility integrated into the new organisational structure.
  • Design of the new bridge over the River Isarco, if required.
  • A new passenger terminal.
  • A new office building, housing RFI’s units located in the buildings that will be demolished to modify the railway site.
  • A cycle and pedestrian underpass linking the future bus terminals and the underground car park.

Following the conversion into law of Decree-Law 32, published in the Official Journal 58 of 11 March 2026, Article 5 of that decree provided for the appointment of RFI SpA’s Chief Executive Officer as Extraordinary Commissioner.

The Extraordinary Commissioner, by Order 3 of 15 June 2026, appointed Giuseppe Romeo, Head of RFI SpA’s North-East Investment Department.

The advantages

The new railway projects being implemented in the Bolzano area have significant implications for South Tyrol in terms of:

  • Better integration between rail transport, (urban and suburban) buses, cycling and shared mobility services
  • Improved station accessibility for all users
  • Redevelopment of the station premises and surrounding areas
  • Reconnection of currently separated parts of the city
  • Enhancing the region’s appeal
  • Integration between infrastructure planning and urban development
60 km/h maximum speed
2.1 total kilometres
370 mln € in investments
60 km/h maximum speed
2.1 total kilometres
370 mln € in investments

Work progress

Here are the details of the progress of the railway regeneration works in the Bolzano area:
  • Design
    Since 2025
  • Permits
    Since 2027
  • Tenders
    -
  • Start of work
    -
  • Activation
    -

Bolzano Area - Railway works in the Bolzano area

Progress: Technical and Economic Feasibility Study (PTFE) in progress